Counter-Drone Deployment Statistics at Civil Airports
By Avantika Kapoor · Published
Bristol Airport’s three-month detection pilot led to a three-year agreement announced in May 2020. In March 2021 the FAA selected five US host airports to evaluate detection and mitigation technologies. These records answer different deployment questions: Bristol provides an example of a pilot progressing to a contract, while the US announcement identifies a research cohort.
Civil airport counter-drone evidence by site, duration and stage
| Programme and date | Reported measure | Stage and denominator | Source |
|---|---|---|---|
| Bristol Airport · May 2020 | 3 months | Pilot period at one UK airport. | [1] |
| Bristol Airport · same release | 3 years | Subsequent agreement for the same site. | [1] |
| FAA research programme · 2 March 2021 | 5 host airports | US airports selected to participate in evaluation. | [2] |
| FAA research programme · announced scope | At least 10 technologies or systems | Planned evaluation scope across the programme. | [2] |
How many installed sites does the Bristol case establish?
For a historical list of locations with a contracted system, count Bristol once and attach two dated stages to it. Counting a pilot and successor contract as two sites would double its geographic footprint. One known conversion also leaves the conversion rate for the wider market undetermined: that rate needs the whole cohort of pilots eligible to convert over a defined follow-up period.
How to compare site activity with a market forecast
The FAA announcement identifies a programme planned across multiple environments. It leaves both allocation of technologies per site and subsequent purchasing decisions open. UXV Searcher publishes a separate global counter-UAS value scenario with category totals and assumptions. A contracted site, a test location and one dollar of modeled revenue belong in three distinct reporting columns.
Research questions
Did each FAA host airport evaluate two technologies?
The FAA set a programme-wide target of at least ten technologies or systems. Dividing that threshold by five sites does not establish the allocation or the completed tests at any particular airport.
Does Bristol’s agreement establish that the system is in service today?
The announcement establishes the agreement and its original three-year term. An extension, replacement or later operating confirmation would be needed to classify the present status of the site.